镘涂无溶剂环氧自流平面漆和地坪表面的处理

发布时间:2018-10-11 浏览次数:50
镘涂无溶剂环氧自流平面漆和地坪表面的处理

镘涂无溶剂环氧自流平面漆:在涂刷完底漆、无溶剂环氧中涂漆实干后。镘涂一道无溶剂环氧自流平面漆。施工时先将A组份开始搅匀后,再将B组份倒入A组份,然后充沛拌和3分钟以上至涂料均匀。混合后运用期为25分钟(25℃)。现用现配、用多少配多少。整个漆面一次性施工完。被涂物含水率大于8%,涂装场所地表温度低于5℃,或高于35℃,相对湿度大于80%,应防止施工。施工面漆结果后,防尘、关闭现场。施工完结24小时可运用(25℃)(仅限在上面行走)漆膜维护时间为7天(25℃)(能够正常运用)7天内禁止用沾水或其他化学品的拖布整理。施工前涂料温度应保持在20℃左右。


镘涂无溶剂环氧自流平面漆和地坪表面的处理


地坪外表的处理:新竣工的工业水泥地上有必要通过必定的维护后方可施工,约28天。铲除外表的水泥浮浆、旧漆以及粘附的废物杂物。完全铲除外表的油污,用克油王清洗剂处理。铲除生产厂房内的积水,并使湿润处完全枯燥。外表的清洁需用无尘清扫机及大型吸尘器来完结。平坦的外表答应空地为2-2.5mm,含水率在6%以下。地坪外表的打毛,需用无尘打磨机来完结,并用吸尘器完全清洁。对地坪外表的洞孔和显着凹陷处使用腻子来添补披刮,实干后打磨吸尘。整理完的厂房内水泥地上应无尘、无水、无油污。


镘涂无溶剂环氧自流平面漆和地坪表面的处理


Solventless epoxy self flow surface paint: after priming and solvent free epoxy coating. A solventless epoxy self flowing surface paint is applied to the trowel. During the construction, component A is stirred initially, then component B is poured into component A, and then fully stirred for more than 3 minutes until the coating is uniform. After mixing, the use period is 25 minutes (25 degrees Celsius). How much is the match now and how much? The entire paint finish is completed once and for all. The moisture content of the coated material is more than 8%, the surface temperature of the coating site is lower than 5, or higher than 35, and the relative humidity is greater than 80%. Construction should be avoided. After the construction of the finish, dust and seal the scene. 24 hours after the completion of the construction can be used (25 degrees Celsius) (only walking on it) paint film maintenance time for 7 days (25 degrees Celsius) (can be used normally) 7 days prohibited with water or other chemicals mop cleaning. The paint temperature should be maintained at around 20 C before construction.


镘涂无溶剂环氧自流平面漆和地坪表面的处理


Floor surface treatment: newly completed industrial cement floor must be maintained before construction, about 28 days. Remove surface cement slurry, old paint and adhesive trash. Thoroughly remove the oil from the surface and use the king oil cleaner. Clear the water in the production plant and make the wet place completely dry. Surface cleaning must be done with dust-free sweeper and large vacuum cleaner. The smooth surface allows the gap to be 2-2.5mm, and the moisture content is below 6%. The floor surface needs to be finished with a dust-free grinding machine and thoroughly cleaned with a vacuum cleaner. Putty is used to fill the holes and holes in the surface of the floor. After cleaning, the cement floor should be clean, water free and oil-free.