环氧地坪施工起水泡色差原因及预防方法

发布时间:2019-03-23 浏览次数:181
环氧地坪施工起水泡色差原因及预防方法

环氧地坪施工色差缘由:环氧树脂涂料主剂沉淀,未充沛搅拌平均;倒料在空中上,与前接缝处之接触时间过久;涂层厚薄不均;施工中途断料;采用不同批号面漆。环氧地坪施工预防色差办法:施工前主剂应先充沛搅拌平均;防止与前接缝处接触距离大久,尽可能整个操作线一同施工;尽量运用固定工具及增强施工人员施工纯熟度;涂料须一次备足,避免断料;尽可能运用同一批号涂料。


环氧地坪施工起水泡色差原因及预防方法


Reasons for color difference in epoxy floor construction: precipitation of main agent of epoxy resin coating, insufficient mixing average; long contact time between pouring material and front joint in air; uneven thickness of coating; material breakage in construction; different batch topcoat. The precautions against chromatic aberration in epoxy floor construction are as follows: before construction, the main agent should be fully agitated and averaged; the contact distance between the main agent and the front joint should be prevented for a long time, and the whole operation line should be constructed together; the fixed tools should be used as far as possible and the construction purity of the builders should be enhanced; the coatings should be prepared at one time to avoid material breakage; and the same batch of coatings should be used as far as possible.


环氧地坪施工起水泡色差原因及预防方法


环氧地坪施工起水泡缘由及预防办法:构造体公开层、水箱旁、底楼层或其它空中水气湿度偏高;没做断水处置或底漆封锁不良。预防办法,首先要把空中打磨好,要不然很有可能粘接力不行。每一层干了后也要打磨,要不然也会呈现上面的状况。留意施工的时分,别穿插施工,以免影响质量。料要搅拌好,要每一层都干了后再做下一道工序,以免呈现起泡等问题。施工环境、天气太潮湿了就中止工作。施工前先以水份计辅佐判别;水份及水压太高的地点须先做断水处置;选择亲水性的环氧树脂底漆。


环氧地坪施工起水泡色差原因及预防方法


Causes and preventive measures of blistering in epoxy floor construction: high humidity of water and air in open layer of structure, near water tank, bottom floor or other air; no water cut-off disposal or poor primer blockade. Preventive measures, first of all, to grind well in the air, otherwise it is likely that the adhesion is not good. Every layer should be polished after it is dried, otherwise it will show the above situation. Pay attention to the construction time, do not insert construction, in order to avoid affecting the quality. Material should be stirred well, and each layer should be dried before the next process, so as to avoid foaming and other problems. The construction environment and weather are too wet to stop work. Before construction, the water meter should be used to assist the discrimination; the water cut-off treatment should be done at the place where the water content and pressure are too high; and hydrophilic epoxy resin primer should be selected.